School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Vista Continuation High School Modernization: Metal Lockers RFP
Providing and installing all metal lockers and aluminum locker benches, turn-key.
Description: Work includes standing seam metal roofing including but not limited to factory-formed panels, concealed or exposed fastener systems, ridge caps, hips, valleys, and all associated clips, brackets, and hardware required for a complete and weather-tight roof system.
SchoolDistrict · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Kern High School District.
Adjacent opportunities open for bidding right now.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Providing and installing all metal lockers and aluminum locker benches, turn-key.
School DistrictCA
Posted
-
Oct 21, 2026
Work includes structural steel framing, including but not limited to columns, beams, angles, plates, pipe, hollow structural steel, galvanized steel, and hardware/bolt assemblies.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work include exterior portland cement plasterwork (stucco) with acrylic finish coat system, includes all accessories.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work includes complete TPO roofing system, including fully adhered, mechanically fastened, or ballasted membrane as indicated, with all required cover boards, insulation (including tapered insulation for positive drainage), base sheets, adhesives, primers, sealants, and attachment hardware.