School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Vista Continuation High School Modernization: Metal Lockers RFP
Providing and installing all metal lockers and aluminum locker benches, turn-key.
Description: Work include exterior portland cement plasterwork (stucco) with acrylic finish coat system, includes all accessories.
SchoolDistrict · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Providing and installing all metal lockers and aluminum locker benches, turn-key.
School DistrictCA
Posted
-
Oct 21, 2026
Work includes structural steel framing, including but not limited to columns, beams, angles, plates, pipe, hollow structural steel, galvanized steel, and hardware/bolt assemblies.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work includes provide all primers, paint, coatings, putty’s, concrete sealer, fillers, grout, and accessories for application which include but are not limited to exposed building and site exterior items / surfaces and exposed interior items / surfaces.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work includes all interior and exterior floor and wall tile, tile trim, cove base, mortar bed, waterproof membrane, crack isolation membrane, sealer, fasteners, shims, spacers and grout required to produce complete, ready for use tiled surface.
Decision makers connected to this RFP from Kern High School District.