CityMS
Posted
Sep 25, 2026
Oct 27, 2026
South Industrial Road Phase 2 RFP
Work consist essentially of construction of two-lane paved roadway and bridge.
Description: Priority 1 expectation is to fine grade, install additional drainage structures, and pave approx. 1,800 LF of existing gravel access road to CMC Steel this fall before asphalt plants close. This section also includes a rail crossing and truck turn around area. Priority 2 will be the realignment and widening of approx. 1,300 LF of to relocate the existing entrance, add turn lanes to U.S. 11, and a construct approx. 600 linear of new access road and a new intersection to the new CMC Steel plant. The new entrance location will require utility relocations of 800 LF of 12" and 1,250 LF of 30" ductile iron water line and 210 linear feet of 8-inch SDR-35 sewer line in the road area.
SpecialDistrict · WV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMS
Posted
Sep 25, 2026
Oct 27, 2026
Work consist essentially of construction of two-lane paved roadway and bridge.
CityGA
Posted
-
Nov 6, 2026
Construction of a new signalized intersection and a new access road. The project will include traffic control, signal installation, concrete curb and median work, asphalt topping, striping and marking, median landscaping, concrete stormwater installation, and all other work necessary for completion of the project.
Special DistrictOR
Posted
-
Oct 29, 2026
Construct approx. 1,870 LF of 24" HDPE DR21 pipe for potable waterline; 1,945 LF of 3" HDPE DR11 pipe for potable waterline; 1,300 CY of Rock to be hammered, removed, and hauled for pipe trenching and installation; 4,300 Tn Supply and Install 3/4"- PG64-28 HMAC per plan. (2) 2" lifts.
CityMS
Posted
-
Oct 15, 2026
Work includes approx 600 LF of 48" cured-in-place pipe lining via UV cured and other appurtenant items.