Hobbs Road Extension RFP
Work includes 2 EA project sign, includes installation and removal, 937 CY excavation, surface de-watering, 376 LF 8' tall precast concrete fence, complete in place, 676 SY remove and dispose of existing pavement and base (all types and depths), includes all saw-cutting required, haul-off and disposal, 1 EA adjust water valve box to grade, complete in place, 1 EA abandoned service drop and pole to be removed, includes haul-off and disposal. See attached file.