Special DistrictTN
Posted
Oct 13, 2026
Nov 17, 2026
Davis Switchgear Upgrade RFP
Work consists of complete vacuum circuit breaker replacement of the existing medium-voltage switchgear circuit breakers.
Description: Work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our high voltage (hv) electricians will be required to perform terminations.
HigherEducation · IA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Iowa State University.
Adjacent opportunities open for bidding right now.
Special DistrictTN
Posted
Oct 13, 2026
Nov 17, 2026
Work consists of complete vacuum circuit breaker replacement of the existing medium-voltage switchgear circuit breakers.
CountyMD
Posted
Oct 6, 2026
Nov 18, 2026
Seeking bids from qualified firms to provide construction services for maintenance, repair and upgrades for dpw projects on an as-needed basis. Construction services may include, but are not limited to, the following: remove and reinstall county-owned pump installations, miscellaneous electrical and mechanical equipment, and other services in collection and treatment processes, valves, piping, and other miscellaneous utility equipment, welding and fabrication services, construction of new or modifications, alterations, replacement, rehabilitation, and repairs to existing water, sewer and reclaimed water piping systems and appurtenances, including but not limited to valves, vaults, hydrants, air/gas management valves, and manholes. See attached file.
Posted
Oct 12, 2026
Oct 23, 2026
Provide building 510 substation upgrade - phase 1. The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear. This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank.
Southeastern Pennsylvania Transportation Authority
Special DistrictPA
Posted
Sep 22, 2026
Oct 22, 2026
Furnish two (2) new 4 MW, 750 VDC Traction Power Rectifier for the Allison Traction Substation DC Equipment Upgrade.