West Virginia Department of Transportation
State AgencyWV
Posted
Aug 8, 2026
Oct 20, 2026
Structure Replacement O'brion Creek Bridge RFP
Structure Replacement O'brion Creek Bridge.
Description: Structure replacement i-79 exit 155 bridge replacement.
StateAgency · WV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
West Virginia Department of Transportation
State AgencyWV
Posted
Aug 8, 2026
Oct 20, 2026
Structure Replacement O'brion Creek Bridge.
West Virginia Department of Transportation
State AgencyWV
Posted
Sep 5, 2026
Nov 17, 2026
Structure replacement milam arch bridge. Concrete slab on fabricated steel girder span(s): 1 structure steel.
Virginia Department of Transportation
State AgencyVA
Posted
-
Nov 18, 2026
Work include 180 LF 15" storm sewer pipe; 41 LF 18" storm sewer pipe; 69 LF 24" storm sewer pipe; 17,293 CY excavation; 1,084 CY siltation control excavation; 334 LF temp. Silt fence type b; 12,168 LF rumble strip cylindrical asphalt; 14,579 LF saw-cut asphalt concrete (18 in. Depth); 153 CY conc. Cl. A4 bridge appr. Slab const. ; 4,931 CY structure excavation const; 217 LF bridge substructure rock socket drilled shaft (48" dia).
Indiana Department of Transportation
State AgencyIN
Posted
Oct 7, 2026
Nov 5, 2026
Work includes 80 CY of common excavation; 252 SY of subgrade treatment, type ic; 139 SY of geotextile for pavement, type 2b; 480 SY of milling, transition; 84 LF of guardrail, mgs w-beam, 6' 3" Spacing; 300 LF of fence, farm field, reset; 219 LF of milled hma corrugations, sinusoidal and associated works.
Decision makers connected to this RFP from West Virginia Department of Transportation.