Cuyahoga Metropolitan Housing Authority
Special DistrictOH
Posted
Oct 5, 2026
Oct 27, 2026
Common Area Floor Repairs and Replacement
Project consists of the complete removal and replacement of the flooring system on the second-floor common areas (hallway, laundry room, closets, storage room and in front of elevator). Removal and replacement of all existing metal thresholds or floor transition strip between corridor and all units, including closets, storage rooms and stair a & b. Removal and replacement of existing vinyl composition tiles (vct), cove base (vinyl) and all floor underlayment gypsum concrete topping (1 gypcrete), and including any felt vapor barrier. Replace as specified in the project drawings and specifications. Verify in field (v. I. F. ).
