Mississippi Department of Transportation
State AgencyMS
Posted
Apr 3, 2026
Oct 27, 2026
IM-0059-02(123) - I-59 from 0.8 mile north of CR 39 to the Clarke County Line - OGFC Lift RFP
Work includes random clearing 711 station, removal of asphalt paved shoulders, all depths 1380 SY, removal of guard rail 2775 LF, removal of guard rail cable anchor 4 EA, fine milling of bituminous pavement, all depths 202,706 SY, expansion joints, with dowels 24 LF, saw cut, longitudinal joints 24 LF, saw cut, full depth 3,129 LF, tie bars, no 5 deformed drilled and epoxied or grouted 6 EA, 1" smooth dowel bars, drilled & epoxied or grouted 12 EA, guard rail, class a, type 1, 'w' beam, metal post 2213 LF, temporary traffic stripe, continuous white 26 mile, temporary traffic stripe, continuous yellow 26 mile, delineators, guard rail, white 28 EA. See attached file.