CountyWA
Posted
Sep 30, 2026
Oct 22, 2026
Hanks Road Phase 1 RFP
Work includes approx 1 LS clearing grubbing; 19,520 CY roadway excavation including haul; 2,607 LF beam guardrail type 31; 1,117 LF 12" culvert pipe, 0.064 " thick.
Description: Provide road reconstruction phase 1.
County · TX, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyWA
Posted
Sep 30, 2026
Oct 22, 2026
Work includes approx 1 LS clearing grubbing; 19,520 CY roadway excavation including haul; 2,607 LF beam guardrail type 31; 1,117 LF 12" culvert pipe, 0.064 " thick.
Posted
Sep 29, 2026
Oct 21, 2026
The project will reconstruct existing roadways to allow two travel lanes, one two-way left turn lane, and bike lanes. Other work includes replacement of curb and gutter, construction of sidewalks with tree wells, LED pedestrian and street lighting, upgrade of storm drainage, joint utility trench, upgrade to watermain, upgrade of curb ramps to ADA guidelines, and modifications/upgrading of traffic signals including installation of accessible pedestrian push buttons and installation of optical fiber and connection.
CityCT
Posted
Sep 24, 2026
Oct 28, 2026
Work includes 100 CY earth excavation; 7,650 LF saw cut existing pavement; 24 EA stone bound(monument) to be protected; 50 CY compacted granular fill; 83 LF geotextile silt fence; 22 EA catch basin sediment filter; 1,700 SY pavement restoration; 8 EA reset catch basin top; 7 catch basin top; 6 EA rebuild catch basin; 20 F structural repair concrete; 4,800 LB deformed steel bars-galvanized; 336 LF drill & grout reinforcing bars into existing concrete; 4,500 LF monolithic portland cement concrete curb; 1,800 SF integral rear sidewalk curb; 445 LF new granite curb. See outside link.
CityAZ
Posted
-
Dec 14, 2026
Construction of new roadway.
Decision makers connected to this RFP from Jefferson County.