CityCA
Posted
Oct 7, 2026
Nov 5, 2026
Description: The City of Huntington Beach is soliciting bids to upgrade its Well 4 facility, which discharges groundwater into Peck Reservoir. Work includes removing existing well infrastructure and installing a new well pump, building, piping, instruments, and electrical equipment; demolition of the chlorine building and installation of PLC-0004 are optional. This is an electronic, lump-sum Invitation for Bid for a 240-working-day construction project, not a grant program.
City · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Huntington Beach.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Oct 7, 2026
Nov 5, 2026
This construction IFB calls for clearing the site, demolishing and salvaging existing infrastructure, installing a new well pump and motor, and reconfiguring vault piping. It also includes a granular activated carbon treatment system with pressure vessels, prefilters, a backwash tank, and sodium hypochlorite disinfection and chemical storage. Work further covers electrical and instrumentation integration with the SCADA system and site improvements, including an access drive, equipment pads, and a stormwater drywell system.
CityMI
Posted
Oct 8, 2026
Nov 10, 2026
This project involves major infrastructure upgrades divided into two sections. Division A focuses on upgrading the shore well facility by demolishing the existing carbon feed system and installing a new Flexicon automatic system, along with all necessary plumbing, mechanical, and electrical integrations. Division B details wastewater treatment facility upgrades, which include replacing existing final clarifier domes with aluminum ones, installing new Walker Process Equipment worm gear drives, and restoring the concrete tanks and clarifier equipment through blasting, coatings, and metal repairs.
CityMI
Posted
Oct 8, 2026
Nov 10, 2026
This project involves major infrastructure upgrades divided into two sections. Division A focuses on upgrading the shore well facility by demolishing the existing carbon feed system and installing a new Flexicon automatic system, along with all necessary plumbing, mechanical, and electrical integrations. Division B details wastewater treatment facility upgrades, which include replacing existing final clarifier domes with aluminum ones, installing new Walker Process Equipment worm gear drives, and restoring the concrete tanks and clarifier equipment through blasting, coatings, and metal repairs.
CityCA
Posted
Sep 11, 2026
Oct 22, 2026
Requesting proposals from qualified engineering consulting firms to provide professional engineering services for the evaluation and design of improvements to the city's well 24 water facility.