Work consists of bridge replacement. Includes 168 SY of remove concrete sidewalk; 165 SY of remove concrete driveway; 465 ft of remove concrete curb and gutter; 33 SY of remove concrete flatwork; 1,060 SY of remove asphalt pavement; 24 SY of remove asphalt driveway; 1000 SF of clearing and grubbing; 80 CY of roadway excavation; 299 CY of untreated base course; 352 TON of HMA - 1/2"; 216 SF of asphalt driveway, 4" thick; 5 TON of HMA - bike/ped path; 1,505 SF of concrete sidewalk; 465 ft of concrete curb and gutter type b1; 846 SF of concrete flatwork, 4" thick; 1,151 SF of concrete driveway flared, 6" thick; 389 SF of concrete driveway flared, 7" thick; 165 CY of granular backfill borrow; 191 SY of stabilization geotextile; 787 SF of landscape restoration (grass); 477 SF of landscape restoration (rock); 668 SF of landscape restoration (natural ground); remove sign less than 20 SF; relocate sign less than 20 SF.